Education Rebuilt
Choose server:
How moving changed our school
In 2018 the 1st & 2nd EPA.L. Agia Paraskevi relocates to a new state of the art building after 20+ years of being in an unsuitable and ready to fall apart one. The situation got so bad that the students where literally hanging out with the chickens next to the building and as the principal of the school council told us they actually felt like they themselves where the chickens. The construction of the new building was held up since the original contractor "ran out of money" and thus the building was abandoned mid construction, the building stayed in this stage for more than 5 years where it was looted and vandalized. The situation had reached an impasse and so the students decided to step up and speak directly to the mayor resulting in getting heard by the secondary school administration, so years later a second contractor was hired to complete this project and finally put into operation.
You May Also Like
Movie
star 9
Not Even in a Wildest Dream
2017
Movie
star 7.6
Touching the Void
2003
Movie
star 7
Fukushima: A Nuclear Nightmare
2026
Movie
star 7
Into Great Silence
2005
Movie
The Mexia Incident
2025
Movie
Red Girl Rising
2025Rough Cut
2009
Movie
star 5.5
The University of Sing Sing
2011
Movie
star 5.7
Our People Will Be Healed
2017
Movie
Odyssey
2023
Movie
The Standard Deviants: Internet Basics
1999
Movie
star 10
Hinterkaifeck - Die wahre Geschichte hinter Tannöd
2009
Movie
star 7
Samuel Paty, le temps de la justice
2026
Movie
Windsor Castle: After the Fire
2011Rise Above the Mark
2012
Movie
star 5.6
Granny's Sexual Life
2021
Movie
Mayor of Lowell
2025
Movie
star 7.2
First Case, Second Case
1979